Lab – Configure IPv6 Addresses on Network Devices Lab – Configure IPv6 Addresses on Network Devices Topology Addressing

Lab – Configure IPv6 Addresses on Network Devices

Lab – Configure IPv6 Addresses on Network Devices

Topology

Addressing Table

Device

Interface

IPv6 Address

Prefix Length

Default Gateway

R1

G0/0/0

2001:db8:acad:a::1

64

N/A

R1

G0/0/1

2001:db8:acad:1::1

64

N/A

S1

VLAN 1

2001:db8:acad:1::b

64

N/A

PC-A

NIC

2001:db8:acad:1::3

64

fe80::1

PC-B

NIC

2001:db8:acad:a::3

64

fe80::1

Objectives

Part 1: Set Up Topology and Configure Basic Router and Switch Settings

Part 2: Configure IPv6 Addresses Manually

Part 3: Verify End-to-End Connectivity

Background / Scenario

In this lab, you will configure hosts and device interfaces with IPv6 addresses. You will issue
show commands to view IPv6 unicast addresses. You will also verify end-to-end connectivity using
ping and
traceroute commands.

Note: The routers used with CCNA hands-on labs are Cisco 4221 with Cisco IOS XE Release 16.9.4 (universalk9 image). The switches used in the labs are Cisco Catalyst 2960s with Cisco IOS Release 15.2(2) (lanbasek9 image). Other routers, switches, and Cisco IOS versions can be used. Depending on the model and Cisco IOS version, the commands available and the output produced might vary from what is shown in the labs. Refer to the Router Interface Summary Table at the end of the lab for the correct interface identifiers.

Note: Make sure that the routers and switches have been erased and have no startup configurations. If you are unsure, contact your instructor.

Note: The default 2960 Switch Database Manager (SDM) template does not support IPv6. It may be necessary to issue the command
sdm prefer dual-ipv4-and-ipv6 default to enable IPv6 addressing before applying an IPv6 address to the VLAN 1 SVI.

Note: The
default bias template used by the Switch Database Manager (SDM) does not provide IPv6 address capabilities. Verify that SDM is using either the
dual-ipv4-and-ipv6 template or the
lanbase-routing template. The new template will be used after reboot.

S1#
show sdm prefer

Follow these steps to assign the dual-ipv4-and-ipv6 template as the default SDM template:

S1#
configure terminal

S1(config)#
sdm prefer dual-ipv4-and-ipv6 default

S1(config)#
end

S1#
reload

Required Resources

1 Router (Cisco 4221 with Cisco IOS XE Release 16.9.4 universal image or comparable)

1 Switch (Cisco 2960 with Cisco IOS Release 15.2(2) lanbasek9 image or comparable)

2 PCs (Windows with terminal emulation program, such as Tera Term)

Console cables to configure the Cisco IOS devices via the console ports

Ethernet cables as shown in the topology

Note: The Gigabit Ethernet interfaces on Cisco 4221 routers are autosensing and an Ethernet straight-through cable may be used between the router and PC-B. If using another model Cisco router, it may be necessary to use an Ethernet crossover cable.

Instructions

Cable the Network and Configure Basic Router and Switch Settings

After cabling the network, initializing and reloading the router and switch, complete the following:

Configure the router.

Assign the hostname and configure basic device settings.

Configure the switch.

Assign the hostname and configure basic device settings.

Configure IPv6 Addresses Manually

Assign the IPv6 addresses to Ethernet interfaces on R1.

Assign the IPv6 global unicast addresses, listed in the Addressing Table, to both Ethernet interfaces on R1.

Open configuration window

Verify that the correct IPv6 unicast address is assigned to each interface.

Note: The link-local address (fe80::) displayed is based on EUI-64 addressing, which automatically uses the interface Media Access Control (MAC) address to create a 128-bit IPv6 link-local address.

To get the link-local address to match the global unicast address on the interface, manually enter the link-local addresses on each of the Ethernet interfaces on R1.

Note: Each router interface belongs to a separate network. Packets with a link-local address never leave the local network; therefore, you can use the same link-local address on both interfaces.

Use a command of your choice to verify that the link-local address has been changed to
fe80::1.

Close a configuration window

Question:

Which two multicast groups have been assigned to interface G0/0/0?

Type your answers here.

Enable IPv6 routing on R1.

On a PC-B command prompt, enter the
ipconfig command to examine IPv6 address information assigned to the PC interface.

Question:

Has an IPv6 unicast address been assigned to the network interface card (NIC) on PC-B?

Type your answers here.

Enable IPv6 routing on R1 using the
IPv6 unicast-routing command.

Open configuration window

Use a command to verify the new multicast group are assigned to interface G0/0/0. Notice that the all-router multicast group (FF02::2) now appears for interface G0/0/0.

Note: This will allow the PCs to obtain their IP address and default gateway information automatically using Stateless Address Autoconfiguration (SLAAC).

Now that R1 is part of the all-router multicast group ff02::2, re-issue the
ipconfig command on PC-B and examine the IPv6 address information.

Question:

Why did PC-B receive the Global Routing Prefix and Subnet ID that you configured on R1?

Type your answers here.

Assign IPv6 addresses to the management interface (SVI) on S1.

Assign the IPv6 address for S1. Also assign a link-local address for this interface.

Use a command of your choice to verify that the IPv6 addresses are properly assigned to the management interface.

Close a configuration window

Assign static IPv6 addresses to the PCs.

Open the Ethernet Properties
window on for each PC and assign IPv6 addressing.

Verify both PCs have the correct IPv6 address information. Each PC should have two Global IPv6 addresses: one static and one SLACC

Verify End-to-End Connectivity

From PC-A,
ping
fe80::1. This is the link-local address assigned to G0/0/1 on R1.

Ping the S1 management interface from PC-A.

Use the
tracert command on PC-A to verify that you have end-to-end connectivity to PC-B.

From PC-B, ping PC-A.

From PC-B, ping the link-local address for G0/0/0 on R1.

Note: If end-to-end connectivity is not established, troubleshoot your IPv6 address assignments to verify that you entered the addresses correctly on all devices.

Reflection Questions

Why can the same link-local address, fe80::1, be assigned to both Ethernet interfaces on R1?

Type your answers here.

What is the Subnet ID of the IPv6 unicast address 2001:db8:acad::aaaa:1234/64?

Type your answers here.

Router Interface Summary Table

Router Model

Ethernet Interface #1

Ethernet Interface #2

Serial Interface #1

Serial Interface #2

1800

Fast Ethernet 0/0 (F0/0)

Fast Ethernet 0/1 (F0/1)

Serial 0/0/0 (S0/0/0)

Serial 0/0/1 (S0/0/1)

1900

Gigabit Ethernet 0/0 (G0/0)

Gigabit Ethernet 0/1 (G0/1)

Serial 0/0/0 (S0/0/0)

Serial 0/0/1 (S0/0/1)

2801

Fast Ethernet 0/0 (F0/0)

Fast Ethernet 0/1 (F0/1)

Serial 0/1/0 (S0/1/0)

Serial 0/1/1 (S0/1/1)

2811

Fast Ethernet 0/0 (F0/0)

Fast Ethernet 0/1 (F0/1)

Serial 0/0/0 (S0/0/0)

Serial 0/0/1 (S0/0/1)

2900

Gigabit Ethernet 0/0 (G0/0)

Gigabit Ethernet 0/1 (G0/1)

Serial 0/0/0 (S0/0/0)

Serial 0/0/1 (S0/0/1)

4221

Gigabit Ethernet 0/0/0 (G0/0/0)

Gigabit Ethernet 0/0/1 (G0/0/1)

Serial 0/1/0 (S0/1/0)

Serial 0/1/1 (S0/1/1)

4300

Gigabit Ethernet 0/0/0 (G0/0/0)

Gigabit Ethernet 0/0/1 (G0/0/1)

Serial 0/1/0 (S0/1/0)

Serial 0/1/1 (S0/1/1)

Note: To find out how the router is configured, look at the interfaces to identify the type of router and how many interfaces the router has. There is no way to effectively list all the combinations of configurations for each router class. This table includes identifiers for the possible combinations of Ethernet and Serial interfaces in the device. The table does not include any other type of interface, even though a specific router may contain one. An example of this might be an ISDN BRI interface. The string in parenthesis is the legal abbreviation that can be used in Cisco IOS commands to represent the interface.

End of document

2013 – 2024 Cisco and/or its affiliates. All rights reserved. Cisco Public Page
1 of
14 www.netacad.com

2013 – 2024 Cisco and/or its affiliates. All rights reserved. Cisco Public Page
10 of
14 www.netacad.com

image1.png

image2.png

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

 This week, explore the relationship between strategic goals and alignment with projects and best practices from the five process groups, especially

 This week, explore the relationship between strategic goals and alignment with projects and best practices from the five process groups, especially focusing on executing, monitoring, and controlling projects. This assessment is the first component of your course project.   In this assessment, you will write a topic definition statement for your

  For this discussion, compare and contrast the characteristics of quantitative and qualitative research, addressing the philosophical assumptions of

  For this discussion, compare and contrast the characteristics of quantitative and qualitative research, addressing the philosophical assumptions of both. Based on your review of the assigned readings, identify and describe what you believe to be meaningful about the qualitative research design and methodology. Define and describe the context in

  this week, explore scholarly literature on critical success factors and project management success. Specifically, focus on complex projects and their

  this week, explore scholarly literature on critical success factors and project management success. Specifically, focus on complex projects and their success or failures, which may include tools, templates, processes, procedures, and metrics, and their relationship to the five process groups: initiating, planning, executing, monitoring and controlling, and closing. Post

IT 226 Project Two Guidelines and Rubric Competency In this project, you will demonstrate your mastery of the following competencies: ·

IT 226 Project Two Guidelines and Rubric Competency In this project, you will demonstrate your mastery of the following competencies: · Determine appropriate ways to communicate information to internal and external stakeholders · Apply communication techniques to effectively negotiate and manage conflict Scenario You are the manager of a team of 10 software developers working on a new application for your company, Optimum Way Development, which is based out of Raleigh, North Carolina. Your organization recently acquired a smaller software company based in San Jose, California. You have been informed that your team will be bringing on five people from this newly acquired company; all five people will be moving to Raleigh to join your team. You schedule a phone call with the five new team members and discover that they are upset about the recent impersonal message they received from human resources informing them that they would have to relocate to Raleigh in order to stay employed; no one expressed excitement about joining the team. During this conversation, you also discover that many of the new team members have more education and experience than the people currently on your team. Based on the conversation, you notice that most of these team members are likely older than you, whereas all of the current Raleigh team members are younger than you. After the call, one of your current senior team members approaches you about rumors that are circulating concerning the Raleigh team being required to train the new team members from San Jose. They heard that there are plans to eliminate positions and are concerned the new hires will ultimately be taking their positions. The director who oversees your division has requested that you create and present a recommendation report that documents your plans for managing the conflicts that currently exist or may arise on your team. The director has an advanced degree in a computer science-related field and has worked in technology for over a decade. Directions In order to identify and resolve existing and future conflicts, you have been asked to compose and present your plan for managing conflict for this project. In addition to identifying and resolving the conflicts, you are also responsible for keeping the development of the new application moving forward by continuing to meet scheduled milestones. To do this, you will create a recommendation report and corresponding presentation. The audience for both deliverables is your director. As you create your report and presentation, remember to  use communication techniques and platforms that are appropriate for your audience’s preferences and motivations. Both deliverables should be based on the above scenario and include the following: 1. To start,  explain the major elements of the software application, including background, audience, functions, and features. 2. Next,  explain the areas of conflict for the team. Make sure to include contributing factors and the possible impacts. 3. Articulate the desired outcome of any conflict resolution activities. · How would you like to see this conflict resolved? · What is the “best-case” scenario? 4. Recommend action steps for managing areas of possible conflict with a detailed explanation on how the action steps contribute to conflict resolution. 5. In the presentation only,  use dialogue to communicate the appropriate main ideas to the audience. Although you will not give this presentation over video, you should use the speaker’s notes section in PowerPoint to write the accompanying speech. What to Submit To complete this project, you must submit the following: Recommendation Report Your report should be at least 2 full pages in length (not including a title page), single-spaced and submitted as either a Word document or PDF. Outside resources are not required, but any resources used must be appropriately cited using APA style. You may use the  Recommendation Report Template Word Document for this submission. Presentation Your presentation should be in a presentation format (such as PowerPoint) and  provide an overview of the main ideas from the recommendation report. Using the speaker’s notes section of PowerPoint, include the speech that would accompany the presentation. Outside resources are not required, but any resources used must be appropriately cited using APA style. Supporting Materials The following resource(s) may help support your work on the project: Resource:  Software Design Documents Use one of these software design documents to summarize the application in your report and presentation. Shapiro Library Resource:  Shapiro Library APA Style Guide This Shapiro Library guide goes over the basics of APA-style formatting and citations.

STUDENT COVER SHEET- Student and Trainer/Trainer Details

STUDENT COVER SHEET- Student and Trainer/Trainer Details Student ID Student name Contact number Email address Trainer name Jason Chu Course and Unit Details Course code ICT50118/ICT60115 Course name Diploma/Advanced Diploma of IT Unit code ICTICT608 Unit name Interact with a client on a business level Assessment Title Assessment 1 –